| Operations: Great Eastern Energy Corp. Ltd.Raniganj (South) Block, West BengalThe Raniganj  (South) block covers an area of 210 square kilometer. The wells drilled in the  contracted area are connected through an internal MDPE pipeline network that  goes into the gas gathering station of GEECL. From there, the gas is fed into  the dedicated external steel pipeline network of GEECL.
 		    Some of the  key points of the block: 
            Area – 210  square kilometerPresent no.  of wells – 156Wells to be  drilled in the future – 144Deviated  wells successfully drilled – 56Dedicated  pipeline – 77.62km running through Asansol-Durgapur industrial belt Mannargudi Block, Tamil NaduThe  Mannargudi CBM block was received by GEECL in the year 2010 in CBM IV round  conducted by Ministry of Petroleum and Natural Gas (MoPNG).
 Some of the  key points of the block: 
            Area – 667  square kilometersPermeability  – HighExternal  pipeline infrastructure – already in placeWells to be  drilled in the future – 50 core wells and 30 pilot production wellsPresently  under government arbitration     |